What infrastructure costs include ?
hits:751What real estate development projects in infrastructure construction costs include? Throughout the project, the proportion is generally how much? & Nbsp; & nbsp; & nbsp; & nbsp; & nbsp; & nbsp; & nbsp; & nbsp; (a), tax base urban infrastructure construction fees, the annual investment plans of the construction area with approved (including underground construction area) prevail. Project
(b) the outskirts of the city district, 160 yuan per square meter of residential, non-residential 200 yuan per square meter.
(c) The outer suburbs standards imposed by the district or county people's government, reported to the Municipal Development and Reform Commission for approval, but not more than eight urban districts and standards imposed following conditions: The following suburb area of urban infrastructure construction projects fees, housing construction per square meter 60 yuan levy, non-residential construction per square meter 100 yuan levy:
1. energy, transportation, municipal utilities. It does not include the administrations office, living and other construction projects.
2. school teaching facilities. Including teaching building, laboratory building, library, stadium (gymnasium), student dormitories, faculty single sink, halls, student canteen, staff canteens.
3. school teachers quarters. Including vocational high school, not including secondary school, in technology.
4. pollution control, environmental protection facilities. Including waste (sewage) water, gas, powder (smoke) dust, noise, waste and electromagnetic radiation pollution control facilities and water conservation, environmental monitoring and other environmental protection facilities.
5. Detention Center, which remanded, labor camps, dormitory.
6. crematorium ashes Church, the funeral parlor.
7. Army soldier barracks, single cadres quarters, all kinds, airfields, shooting range, training and communications facilities, operational command space, munitions, ordnance reserve and repair houses.
8. approved by the state military special project.
9. construction area of 300 square meters of single sporadic construction projects.
10. industrial technology renovation project.
11. municipal documents are exempt from urban infrastructure construction fees but does not exempt urban infrastructure "four source" other construction project construction costs.