What home improvement budget
hits:775Does anyone know how Xiantao home improvement project budget is counted? (A) affected by several factors decorating cost
1. How many decorative items and quantities is a direct impact on the cost factor.
before decoration should first determine the content of decoration (as do many cabinets, paint or wallpaper, hanging what kind of top, choose what ware and spread what is expected of floors, etc.), then an accurate count
operator works based on the content quantity (quantities contained in labor and materials).
2. ease and precision decoration works is the main factor cost impact.
for example, pipelines, take the open wire on the cheap, go dark line is expensive;
ordinary ceiling cheaper, and more complex there is a hierarchy of the ceiling will be more expensive; the same flooring, solid wood flooring and laminate flooring in labor costs is not the same; in addition, different grades of sanitary safety
installation costs will differ, install a 3000 yuan and 30,000 yuan is not the same.
3. Decorative grade is the key to cost influence.
same material or equipment, imported products, joint venture products with domestic products disparity in price. As also is sanitary ware, made of 1-3 thousand dollars, while the joint venture, as a
in 5-8 thousand dollars, that imports of at least 10,000 yuan, and some even more than 30,000 yuan. For most people, the selection is very luxurious. Important principle is the key positions should, depending on their economic
capacity appropriate to use some high-grade materials, other places you can use some common materials, so the cost will come down. As in the selection of paint, the walls of the available high-grade elastic coating with paint, while the top surface is available
ordinary matte paint.
4. Market price fluctuations are also a factor.
To keep abreast of market conditions, when purchasing more in terms of quality and price for some "shop around", it would be best to find a direct sales manufacturer or dealer. When labor and materials should also understand the market and the amount of material, to avoid being "cut." Level
5. construction of different units, charges are different levels ---- the more expensive the higher the price.
aside quality construction, interior design company alone is the size of a large office lots, and large venues, management overhead costs also large.
(ii) determine the decorative items and decorative standard
decorative items and decorative standards, should be considered under the home conditions and family economic situation, not only do not copy someone else's way (which will lose self-style), and do not blindly competition, because the grade and decorative requirements of each are different, the price will vary greatly.
bathroom equipment Update: selection of joint ventures in the production of high-grade sanitary ware, marble countertops plus washbasin, a toilet, bathtub, stainless steel heads, faucets, towel racks, shower curtain rod and curtain, a large mirror or mirror box, wall, row gas fan and so on.
(c) the master cost estimate method
home decor Cost estimates are generally two ways:
1. + direct costs (direct costs of the integrated X factor) = total cost
large company the usual "transparent pricing "that is the same material per unit price does not exceed the market price guide. This is important for those who requires high-end decorative, if the total cost of 50 million decoration, a difference of 1
, 2 percentage points is spread on a million. But the general decoration company is using a relatively simple method, namely the total cost = material costs + labor costs, therefore, have flexibility in practice, carefully calculated, it must not be applied mechanically. The sum of the individual projects
2. labor and materials cost = sum of the total cost of
already included in the total cost of construction is clear garbage and freight, not be counted twice. If materials or equipment provided by the users themselves, should deduct the money for materials or equipment. Home decoration cost estimates, labor and materials commonly used methods are more special decorations price negotiable.
price by mutual consent after the decoration can sign contract, in the contract to indicate the total cost of the package once dead, as changed, then do another increase, decrease posting process. Also stated in the contract period,
quality, payment and warranty period and other terms. The contract signed by both parties and sealed immediately. Then the need to prepay 65% of the total cost of the project preparation funds, the balance paid in installments may be employed depending on the circumstances